|
Dual primary chamber
system can double the processing rate with a single unit.
|
PLC touch screen display controls
system operation.
|
Chambers are lined
with Ceramic Fiber for fast heat up and cooldown.
|
|
Moving hearths with reduction
gear drives, ease loading of materials.
|
6,000 SCFM HCL Scrubber and
Venturi Quench System for collection of particulate.
|
Honeywell UDC3300 PID Controllers
monitor system. Prepiped Natural Gas valve train can be shipped and
installed prior to delivery of main chamber.
|